Between February 15 and April 2, Trelew Airport will be closed for repairs on the runway and expansion of the commercial platform.
Aerolíneas Argentinas and Austral flights will be reprogrammed to Puerto Madryn Airport.
The surface of the commercial platform will be doubled in order to operate more and larger aircraft. In addition, a system with a new beacon technology will be installed and repair work will be carried out on taxiways.
The Trelew Airport will be renovated and modernized with the aim of boosting tourism in Chubut.
[su_button url=”https://trips-southamerica.com/in-the-news/” style=”flat” background=”#4079b8″ size=”5″ radius=”5″ icon=”icon: mail-reply”]Back to News[/su_button]